A bathroom renovation project to rejuvenate two bathrooms, all completed in nine days.
To begin this project, the original bathroom fixtures and fittings were removed. This involved the removal of tiles, ceilings and paint. Roof vents were also installed and a number of electrical renovations and installations were completed. These included new lighting and switches as well as ventilation fans for bathrooms.
A timber stud wall was constructed to allow for shelving and also bath tiles to be installed. Once complete, all walls were finished with 10mm plaster and then tiled. Ceilings for both bathrooms were lined with moisture-resistant plasterboard with a skim finish.
Bathroom suites for both bathrooms were supplied and installed.
No matter what the project, we’d love to chat, discuss and help.
Contact or visit us using the details below or fill out our contact form and we’ll get back to you as soon as possible.
Call: 0116 269 1240
Email: hello@stotto.co.uk
Pop in for a chat:
3 Meer End – Interchange Business Park Birstall, Leicester, Leicestershire, LE4 3EH.